Step 1: Planning and Excavation
Plan and Excavate: Mark the wall's location, ensure compliance with local codes and excavate the site for a stable foundation.

​

Step 2: Foundation and Formwork
Build Foundation: Pour a reinforced concrete footing at the base.
Set Forms: Install and brace formwork to shape the wall.

​

Step 3: Pouring and Finishing
Pour Concrete: Fill the forms with concrete, ensuring even distribution and eliminating air pockets.
Finish and Cure: Remove forms, smooth the surface, apply sealer, and allow the wall to cure before backfilling.

stem wall
concrete form