top of page
Untitled (2).jpg

CONCRETE FOOTINGS

OUR PROCESS

Step 1: Planning and Excavation
Plan and Mark: Determine the location and dimensions of the footings, marking them according to the structural design.
Excavate: Dig trenches to the required depth and width, ensuring they are level and clean of loose soil and debris.

​

Step 2: Formwork and Reinforcement
Set Up Formwork: Install wooden or metal forms to shape the footings, securing them to prevent movement.
Add Rebar: Place rebar within the trenches for reinforcement, slightly elevated to allow concrete to flow underneath.

​

Step 3: Pouring and Curing
Pour Concrete: Fill the trenches with concrete, ensuring even distribution and eliminating air pockets with a vibrator.
Cure and Finish: Allow the concrete to cure properly, keeping it moist and covered to ensure strength and stability.

concrete footing
concrete form

THE ULTIMATE GUIDE TO CHOOSING THE RIGHT CONCRETE FINISH.

logo
google badge
  • Group 8
  • Group 9
LINKS
​SERVICE AREAS

Prescott,AZ
Prescott Valley, AZ
Chino Valley, AZ
Williamson Valley, AZ
Dewey, AZ
Mayer, AZ

Blog

bottom of page